
The project is carried out thanks to the European Social Fund Plus (ESF+) of the Tuscany Region
The project involved the purchase and installation of a photovoltaic system with a total capacity of 50.14 kWp, ground-mounted on the grounds belonging to the campsite buildings and their annexes.
The initiative is part of an energy efficiency strategy aimed at maximising self-consumption of energy from renewable sources, in order to optimise internal energy flows. The system was designed to feed energy into the local low-voltage distribution grid, so as to establish self-consumption and net metering with the grid for surplus energy.